Quality

Quality strategy

Do it right the first time

DivyaSree Engineering Industries controls quality from design review through factory acceptance, site installation, commissioning and handover. The same system covers incoming materials, workmanship, documentation and close-out.

Quality policy

Do it right the first time

Continual improvement

We work to achieve and sustain excellence by continually improving the quality management system.

Compliance

Work meets statutory and regulatory requirements, together with the approved specification.

Accountability

Responsibility and a quality mindset sit at every level of the organisation, from factory to site.

Delivery and satisfaction

On-time delivery and high customer satisfaction are measured outcomes of the system, not a separate activity.

Quality organisation

Who owns quality

Our Factory Quality function operates under the strategic direction of the Head of Quality, supported administratively by dedicated Factory Quality Controllers aligned to specific customer requirements. This structure ensures consistent quality, compliance, and customer satisfaction across all operations.

Chief Operating Officer
Head of Quality
Quality In-charge
Quality Controller
Functional reporting Administrative reporting QC: Quality Control
Factory quality work on the shop floor
Installed cable management checked on site
Quality planning for factory work
Recognition for quality performance

Quality team

Key deliverables

Planning quality documents before construction

Pre-construction

  • Quality manual: management plan, assurance plan, method statements, test plan, checklists and formats.
  • Quality visuals: policy, theme, construction do’s and don’ts, and activity-based films.
  • Prequalification criteria and kick-off meetings with key contractors and vendors.
  • Project organisation chart with quality deployment, cascaded to the respective vendors.
Inspection and testing during construction

During construction

  • Inspection of ongoing works and approval of incoming materials at factory and site.
  • Testing of product performance, components and key materials against the requirement.
  • Training for workers, supervisors and engineers, plus toolbox talks and quality walks.
  • Assessments against defined quality parameters and standards.
  • Control of nonconformities through root cause and corrective action.
  • Recognition through Work of the Week, quality awareness and knowledge sharing.
Completed installation ready for handover

Post-construction

  • Snagging and de-snagging, then handover to the concerned representative or authority.
  • Testing and commissioning of product performance and the integrated system test.
  • Training for the operation and maintenance team, with an O&M user manual.
  • Technical assistance during the defect liability period.
  • Further quality improvements based on project learnings.

Quality assurance

Scope of the quality system

Mandatory controls are marked. They stay in place on every project.

Scope What it covers Mandatory
Quality policy and objectives Policy, objectives and the standard the project is measured against.
Management responsibilities Organisation chart, roles and responsibilities, project organisation and site organisation.
Control of documents Document and correspondence control, the project documentation system, engineering control, preparation and checking of drawings, release of drawings, procurement, construction control, inspection and testing, and the lists of ITP, FQP, method statements, ICL, CCL and CR. Includes control of customer-supplied products. Yes
Materials and equipment Control, handling, storage and preservation, packaging, control of testing and measuring devices, and commissioning.
Nonconforming product Identification and control of product that does not meet the requirement. Yes
Corrective action Action that removes the cause of a detected nonconformity. Yes
Risk and prevention Risk evaluation and preventive measures before the same issue repeats. Yes
Monitoring and measurement Measurement of the process, not only the finished item.
Internal quality audit Independent check that the project is working to its own plan. Yes
Project handover Documented transfer to the operations team.
Project-specific procedures Procedures written for the works on that project.
Control of records Retention of the records that prove the work was done as approved. Yes